1 00:00:01,568 --> 00:00:04,569 Captions by VITAC www.vitac.com 2 00:00:04,570 --> 00:00:07,607 CAPTIONS PAID FOR BY DISCOVERY COMMUNICATIONS 3 00:00:07,632 --> 00:00:11,732 Sync & Corrected by Iscol@HDVietNam.com 4 00:00:52,051 --> 00:00:55,788 Narrator: THE FIRST FIREPLACES WERE STRICTLY FUNCTIONAL 5 00:00:55,789 --> 00:00:59,191 FOR HEATING THE HOME, COOKING MEALS, 6 00:00:59,192 --> 00:01:01,260 AND WARMING WATER FOR BATHING. 7 00:01:01,261 --> 00:01:05,030 OVER TIME, FIREPLACES APPEARED IN OTHER ROOMS OF THE HOUSE 8 00:01:05,031 --> 00:01:07,600 AND ACQUIRED ASCETIC FEATURES SUCH AS WOOD, 9 00:01:07,601 --> 00:01:09,501 STONE, OR TILE WORK. 10 00:01:12,671 --> 00:01:15,839 THIS CERAMIC FIREPLACE IS A HERITAGE MODEL 11 00:01:15,840 --> 00:01:18,276 INSPIRED BY FIREPLACES OF THE LATE 19th 12 00:01:18,277 --> 00:01:20,779 AND EARLY 20th CENTURY. 13 00:01:20,780 --> 00:01:23,983 CERTAIN TILES ARE EXACT REPLICAS OF ORIGINALS. 14 00:01:25,951 --> 00:01:30,220 AT THE CERAMIC FACTORY THEY MIX WATER WITH CLAY, 15 00:01:30,221 --> 00:01:34,026 FELDSPAR, AND SILICA IN A PUGMILL. 16 00:01:34,027 --> 00:01:37,194 TOGETHER, THESE FORMULATE A CLAY BLEND. 17 00:01:37,195 --> 00:01:39,396 ONCE THE MIX IS THE RIGHT CONSISTENCY, 18 00:01:39,397 --> 00:01:41,331 THE OPERATOR PRESSES A BUTTON, 19 00:01:41,332 --> 00:01:43,869 AND THE MILL SWITCHES TO EXTRUSION MODE. 20 00:01:43,870 --> 00:01:48,239 THIS FORCES THE CLAY BLEND THROUGH A MANTEL SHAPED DIE 21 00:01:48,240 --> 00:01:52,610 AND PRODUCES A 10- TO 15-INCH LONG EXTRUDED MANTEL PIECE. 22 00:01:52,611 --> 00:01:54,512 THEY TRIM THE PIECE WITH A CUTTING WIRE 23 00:01:54,513 --> 00:01:57,881 TO THE PRECISE LENGTH REQUIRED. 24 00:01:57,882 --> 00:02:01,818 THEY USE THIS EXTRUSION METHOD FOR MAKING LONGER PIECES. 25 00:02:01,819 --> 00:02:03,554 IF THEY NEED SHORTER ONES 26 00:02:03,555 --> 00:02:06,692 THEY OFTEN CAST THEM INDIVIDUALLY IN A MOLD. 27 00:02:08,093 --> 00:02:11,196 WHEN CASTING THEY ADD SIGNIFICANTLY MORE WATER 28 00:02:11,197 --> 00:02:15,233 TO THE CLAY BLEND TO PRODUCE A LIQUID CLAY CALLED SLIP. 29 00:02:15,234 --> 00:02:18,103 THEY POUR THE SLIP INTO A PLASTER MOLD. 30 00:02:18,104 --> 00:02:21,906 THE POROUS PLASTER GRADUALLY ABSORBS MOST OF THE WATER, 31 00:02:21,907 --> 00:02:24,575 LEAVING A LAYER OF CLAY ABOUT 6 MILLIMETERS THICK 32 00:02:24,576 --> 00:02:27,812 ON THE WALLS OF THE MANTEL-SHAPED CAVITY. 33 00:02:27,813 --> 00:02:31,448 AFTER A FEW HOURS, THEY POUR OUT THE EXCESS SLIP 34 00:02:31,449 --> 00:02:35,254 AND OPEN THE MOLD TO EXTRACT THE CAST MANTEL PIECE. 35 00:02:37,289 --> 00:02:40,557 ONCE THE CLAY BECOMES FIRM ENOUGH TO HANDLE 36 00:02:40,558 --> 00:02:42,693 THEY CAREFULLY TRIM OFF THE EXCESS 37 00:02:42,694 --> 00:02:45,330 AROUND THE OPENING IN THE MOLD. 38 00:02:47,165 --> 00:02:49,434 THEN THEY GENTLY SMOOTH DOWN THE SEAM 39 00:02:49,435 --> 00:02:53,738 ALONG THE JUNCTION BETWEEN THE TWO HALVES OF THE MOLD. 40 00:02:53,739 --> 00:02:55,874 ON THE OPPOSITE SIDE OF THE POUR HOLE, 41 00:02:55,875 --> 00:02:59,144 THEY CUT OUT A MATCHING HOLE. 42 00:02:59,145 --> 00:03:01,711 THIS WILL HELP THE CLAY DRY FASTER 43 00:03:01,712 --> 00:03:05,217 BY ENABLING AIR TO FLOW THROUGH THE INSIDE OF THE PIECE. 44 00:03:06,853 --> 00:03:08,619 TO COMPENSATE FOR SHRINKAGE, 45 00:03:08,620 --> 00:03:12,456 THE MOLDS AND EXTRUSION DIES ARE DESIGNED 11% LARGER 46 00:03:12,457 --> 00:03:15,059 THAN THE SIZE OF THE FINISHED PIECE. 47 00:03:15,060 --> 00:03:17,861 CLAY SHRINKS AS IT DRIES. 48 00:03:17,862 --> 00:03:20,399 TO MAKE THE FIREPLACE'S CERAMIC TILES, 49 00:03:20,400 --> 00:03:23,601 THEY PRODUCE A RUBBER MOLD OF TWO ADJOINING TILES 50 00:03:23,602 --> 00:03:25,736 AND PLACE IT INSIDE A METAL CASING. 51 00:03:25,737 --> 00:03:29,139 THEY ALSO INCLUDE A RELEASE SYSTEM TO HELP WITH EXTRACTION. 52 00:03:29,140 --> 00:03:30,541 THEY FILL THE CASING 53 00:03:30,542 --> 00:03:33,045 WITH AN EXCEPTIONALLY STRONG TYPE OF PLASTER. 54 00:03:33,046 --> 00:03:35,145 IT SETS IN ABOUT HALF AN HOUR, 55 00:03:35,146 --> 00:03:37,715 TAKING ON THE SHAPE OF THE RUBBER MOLD. 56 00:03:37,716 --> 00:03:39,418 THIS PLASTER CASTING 57 00:03:39,419 --> 00:03:42,621 IS THE DIE THEY'LL NOW USE TO PRODUCE THE TILES. 58 00:03:42,622 --> 00:03:45,523 THEY MOUNT THE DIE ON WHAT'S KNOWN AS A RAM PRESS 59 00:03:45,524 --> 00:03:48,827 BECAUSE IT LITERALLY RAMS A BLOCK OF CLAY IN THE DIE 60 00:03:48,828 --> 00:03:51,965 AND COMPRESSES IT WITH 30 TONS OF PRESSURE. 61 00:03:54,432 --> 00:03:58,636 THE TILE DIE IS ALSO 11% LARGER THAN THE FINAL SIZE 62 00:03:58,637 --> 00:04:02,674 TO COMPENSATE FOR SHRINKAGE DURING DRYING AND FIRING. 63 00:04:02,675 --> 00:04:04,476 THEY REMOVE EXCESS CLAY 64 00:04:04,477 --> 00:04:08,979 AND SEND IT BACK TO THE PUGMILL TO BE RECYCLED. 65 00:04:08,980 --> 00:04:11,416 THEN THEY POSITION A BOARD UNDER THE DIE 66 00:04:11,417 --> 00:04:13,484 AND ACTIVATE THE RELEASE SYSTEM, 67 00:04:13,485 --> 00:04:17,223 WHICH EXTRACTS THE CLAY WITH A BLAST OF COMPRESSED AIR. 68 00:04:21,526 --> 00:04:24,764 THEY TRIM OFF THE EXCESS CLAY. 69 00:04:28,300 --> 00:04:30,001 ONCE DRY, 70 00:04:30,002 --> 00:04:33,239 THE TILES AND MANTEL PIECES ARE READY TO BE GLAZED. 71 00:04:34,607 --> 00:04:36,407 GLAZE IS A CHEMICAL FORMULA 72 00:04:36,408 --> 00:04:38,809 CONTAINING FINELY GROUND SILICA 73 00:04:38,810 --> 00:04:41,078 COMBINED WITH DIFFERENT COMBINATIONS 74 00:04:41,079 --> 00:04:45,116 OF METALLIC ELEMENTS TO PRODUCE SPECIFIC COLORS. 75 00:04:45,117 --> 00:04:46,516 THEY USE A SPRAY GUN 76 00:04:46,517 --> 00:04:50,153 TO APPLY GLAZE TO THE MANTELS AND A TUBE TIP APPLICATOR 77 00:04:50,154 --> 00:04:51,923 TO GLAZE THE TILES. 78 00:04:54,694 --> 00:04:58,729 THE TILES DESIGN HAS RAISED BORDERS BETWEEN ITS COMPONENTS. 79 00:04:58,730 --> 00:05:00,998 THESE ARE CALLED CUENCA LINES. 80 00:05:00,999 --> 00:05:02,835 THEY PREVENT THE DIFFERENT COLORED GLAZES 81 00:05:02,836 --> 00:05:05,204 FROM FLOWING INTO EACH OTHER. 82 00:05:10,675 --> 00:05:12,710 THE GLAZED MANTEL PIECE AND TILES 83 00:05:12,711 --> 00:05:18,583 NOW GO INTO A GAS-FIRED KILN FOR 12 TO 14 HOURS. 84 00:05:18,584 --> 00:05:22,020 THE HIGH TEMPERATURE, 2,100 DEGREES FAHRENHEIT, 85 00:05:22,021 --> 00:05:23,987 TRIGGERS CHEMICAL REACTIONS 86 00:05:23,988 --> 00:05:26,023 WHICH HARDEN AND STRENGTHEN THE PIECES. 87 00:05:26,024 --> 00:05:29,061 THE CLAY'S MINERAL COMPOSITION TRANSFORMS 88 00:05:29,062 --> 00:05:31,263 INTO A COMPLETELY NEW CONFIGURATION 89 00:05:31,264 --> 00:05:33,231 OF CRYSTALS AND GLASS. 90 00:05:33,232 --> 00:05:37,236 AS FOR THE GLAZE, ITS PRECISE FORMULATION OF METALLIC ELEMENTS 91 00:05:37,237 --> 00:05:39,337 PRODUCES A SPECIFIC COLOR, 92 00:05:39,338 --> 00:05:41,907 AND THE SILICA MELTS INTO A GLASS SURFACE. 93 00:05:41,908 --> 00:05:44,676 THE CERAMICS ARE NOW SMOOTH AND SHINY 94 00:05:44,677 --> 00:05:48,046 AND READY TO TRANSFORM AN OTHERWISE ORDINARY FIREPLACE 95 00:05:48,047 --> 00:05:50,950 INTO A WORK OF ART. 96 00:05:57,000 --> 00:05:58,802 Narrator: MANY WINEMAKERS CHOOSE TO SEAL THEIR BOTTLES 97 00:05:58,803 --> 00:06:02,470 WITH SYNTHETIC CLOSURES INSTEAD OF NATURAL CORK FROM TREE BARK. 98 00:06:02,471 --> 00:06:04,206 THIS PREVENTS CORK TAINT, 99 00:06:04,207 --> 00:06:06,107 WHICH HAPPENS WHEN NATURAL CORK 100 00:06:06,108 --> 00:06:08,809 GETS CONTAMINATED BY THE TCA MOLECULE. 101 00:06:08,810 --> 00:06:12,614 CORK TAINT IS COMPLETELY HARMLESS TO HUMANS, 102 00:06:12,615 --> 00:06:15,185 BUT SPOILS THE TASTE OF THE WINE. 103 00:06:17,219 --> 00:06:20,187 THIS ENGINEERED CORK IS ENTIRELY SYNTHETIC 104 00:06:20,188 --> 00:06:24,091 AND THEREFORE RESISTANT TO TCA CONTAMINATION. 105 00:06:24,092 --> 00:06:27,295 IT'S MADE OF A FOOD-GRADE POLYETHYLENE FOAM CORE 106 00:06:27,296 --> 00:06:31,165 ENCASED IN ELASTICIZED POLYMER SKIN. 107 00:06:31,166 --> 00:06:35,203 BOTH MATERIALS CONTRACT TO SQUEEZE INSIDE THE BOTTLENECK 108 00:06:35,204 --> 00:06:36,838 BUT THEN REGAIN THEIR ORIGINAL SHAPE 109 00:06:36,839 --> 00:06:39,040 TO SEAL THE OPENING. 110 00:06:39,041 --> 00:06:40,475 TO MAKE THE FOAM CORE, 111 00:06:40,476 --> 00:06:44,112 THEY MIX TALC WITH PELLETS OF LOW DENSITY POLYETHYLENE, 112 00:06:44,113 --> 00:06:46,581 A PLIABLE TYPE OF PLASTIC. 113 00:06:46,582 --> 00:06:49,552 THEN THEY ADD PELLETS OF DARK BROWN AND BEIGE COLORANT 114 00:06:49,553 --> 00:06:52,955 TO MIMIC THE WOOD GRAIN LOOK OF NATURAL CORK. 115 00:06:54,623 --> 00:06:56,891 FOR EACH CUSTOMER'S ORDER OF CORKS, 116 00:06:56,892 --> 00:06:59,860 A COMPUTERIZED SYSTEM AUTOMATICALLY RELEASES 117 00:06:59,861 --> 00:07:02,097 THE RIGHT AMOUNT OF EACH INGREDIENT 118 00:07:02,098 --> 00:07:04,633 INTO AN INDUSTRIAL BLENDER. 119 00:07:04,634 --> 00:07:08,905 THE BLENDER FEEDS A SPECIALLY DESIGNED DUAL EXTRUSION MACHINE. 120 00:07:08,906 --> 00:07:12,408 THE MACHINE MELTS THE FOAM MIX TO A LIQUID STATE 121 00:07:12,409 --> 00:07:14,843 THEN INJECTS CARBON DIOXIDE. 122 00:07:14,844 --> 00:07:16,345 THIS PRODUCES BUBBLES, 123 00:07:16,346 --> 00:07:20,148 WHICH CREATE THE CELLULAR STRUCTURE OF THE FOAM. 124 00:07:20,149 --> 00:07:23,018 THE LIQUID FOAM ENTERS THE MACHINE'S HORIZONTAL EXTRUDER, 125 00:07:23,019 --> 00:07:27,555 WHILE ELASTICIZED POLYMER ENTERS THE MACHINE'S ANGLED EXTRUDER. 126 00:07:27,556 --> 00:07:28,956 BOTH EXTRUDERS 127 00:07:28,957 --> 00:07:31,759 SQUEEZE THEIR MATERIALS THROUGH THE SAME SHAPING DIE, 128 00:07:31,760 --> 00:07:35,230 WHICH OUTPUTS A CONTINUOUS ROD OF SKIN-ENCASED FOAM. 129 00:07:35,231 --> 00:07:39,100 THE FOAM CORE IMMEDIATELY EXPANDS. 130 00:07:39,101 --> 00:07:41,302 THE ELASTIC SKIN STRETCHES WITH IT. 131 00:07:41,303 --> 00:07:44,172 A WATER BATH COOLS THE ROD, 132 00:07:44,173 --> 00:07:47,509 HALTING THIS EXPANSION AT A SPECIFIC DIAMETER. 133 00:07:47,510 --> 00:07:49,711 THEN, AN UNDERWATER ULTRASONIC GAUGE 134 00:07:49,712 --> 00:07:53,114 MEASURES THE THICKNESS OF THE OUTER SKIN 135 00:07:53,115 --> 00:07:55,752 TO MAKE SURE IT MEETS SPECIFICATIONS. 136 00:07:56,820 --> 00:07:59,621 THE ROD EXITS THE WATER BATH 137 00:07:59,622 --> 00:08:03,160 AND CONTINUES COOLING AND SHRINKING AS IT DRIP DRIES. 138 00:08:05,428 --> 00:08:09,499 A LASER GAUGE THEN VERIFIES THAT THE ROD IS PERFECTLY ROUND 139 00:08:09,500 --> 00:08:12,768 AND MEASURES A SPECIFIC DIAMETER BY THIS POINT. 140 00:08:14,137 --> 00:08:15,636 WHEN ANY OF THE MEASURING GAUGES 141 00:08:15,637 --> 00:08:19,107 DETECTS AN AREA THAT DOESN'T MEET SPECIFICATIONS, 142 00:08:19,108 --> 00:08:22,076 THAT PART OF THE ROD IS FLAGGED IN THE SYSTEM 143 00:08:22,077 --> 00:08:25,248 AND IS DISCARDED AT THE END OF THE PRODUCTION LINE. 144 00:08:28,384 --> 00:08:32,487 THE ROD NOW ENTERS THE FINAL COOLING PHASE. 145 00:08:32,488 --> 00:08:36,926 IT TRAVELS IN SEVERAL LOOPS PAST NOZZLES SPRAYING COLD WATER. 146 00:08:42,098 --> 00:08:45,833 AS THE ROD COOLS, IT SHRINKS TO ITS FINAL SIZE, 147 00:08:45,834 --> 00:08:50,005 A DIAMETER OF BETWEEN 22 AND 23 MILLIMETERS. 148 00:08:50,006 --> 00:08:51,673 IT'S DESIGNED TO FIT SNUGLY 149 00:08:51,674 --> 00:08:55,879 INSIDE THE STANDARD 18.5-MILLIMETER BOTTLE OPENING. 150 00:08:58,515 --> 00:09:02,050 THEY HAD TO CALCULATE EXACTLY HOW WIDE TO EXTRUDE THE ROD 151 00:09:02,051 --> 00:09:04,920 SO THAT AFTER EXPANSION THEN SHRINKAGE, 152 00:09:04,921 --> 00:09:07,891 IT WOULD END UP AT THIS PRECISE DIAMETER. 153 00:09:10,093 --> 00:09:12,261 THE ROD NOW ENTERS A CUTTER. 154 00:09:12,262 --> 00:09:15,829 THE BLADE IS SO SHARP THAT A SAFETY COVER IS MANDATORY. 155 00:09:15,830 --> 00:09:18,567 IT'S REMOVED HERE ONLY FOR THE CAMERA. 156 00:09:24,406 --> 00:09:28,644 THE WINERY PLACING THE ORDER SPECIFIES THE CORK LENGTH. 157 00:09:28,645 --> 00:09:31,213 AIR JETS AUTOMATICALLY BLOW OFF ANY CORKS 158 00:09:31,214 --> 00:09:34,015 CUT FROM AREAS THE MEASURING GAUGES FLAGGED 159 00:09:34,016 --> 00:09:35,318 AS BEING PROBLEMATIC. 160 00:09:38,387 --> 00:09:41,423 THE CUTTER SLICES ABOUT 10 STANDARD-LENGTH CORKS 161 00:09:41,424 --> 00:09:43,193 PER SECOND. 162 00:09:48,497 --> 00:09:51,098 ALL THE GOOD CORKS LAND ON THE CONVEYOR BELT 163 00:09:51,099 --> 00:09:53,035 AND TRAVEL TO THE END OF THE LINE, 164 00:09:53,036 --> 00:09:55,237 WHERE COMPUTER SENSORS COUNT THEM 165 00:09:55,238 --> 00:09:57,607 AS THEY DROP INTO A COLLECTION BIN. 166 00:09:59,908 --> 00:10:03,578 ADDITIONAL MACHINES PRINT ON THE WINERY'S NAME AND LOGO, 167 00:10:03,579 --> 00:10:06,582 AND LUBRICATE THE SURFACE WITH SILICONE 168 00:10:06,583 --> 00:10:10,086 SO THE CORKS WILL GLIDE IN AND OUT OF THE BOTTLE WITH EASE. 169 00:10:15,525 --> 00:10:19,696 THE FACTORY'S ON-SITE LAB TESTS SAMPLES FROM EVERY ORDER. 170 00:10:20,796 --> 00:10:23,665 SENSORY SPECIALISTS SNIFF EACH CORK 171 00:10:23,666 --> 00:10:27,001 AND COMPARE IT TO A CONTROL SAMPLE. 172 00:10:27,002 --> 00:10:28,904 THERE MUST BE NO DISCERNIBLE ODOR 173 00:10:28,905 --> 00:10:32,774 THAT MIGHT AFFECT THE AROMA OR FLAVOR OF THE WINE. 174 00:10:32,775 --> 00:10:37,180 IF THERE IS, THE ENTIRE ORDER OF CORKS FAILS INSPECTION. 175 00:10:39,415 --> 00:10:42,817 WHILE NATURAL CORK IS DESIGNED BY MOTHER NATURE, 176 00:10:42,818 --> 00:10:45,953 A SYNTHETIC CORK MANUFACTURER CAN ENGINEER THE CLOSURE 177 00:10:45,954 --> 00:10:49,524 TO FIT MORE OR LESS SNUGLY ACCORDING TO THE AMOUNT OF AIR 178 00:10:49,525 --> 00:10:53,228 THE PARTICULAR WINE NEEDS TO DEVELOP CORRECTLY. 179 00:11:02,838 --> 00:11:05,607 Narrator: MULTI-TIERED PARKING GARAGES 180 00:11:05,608 --> 00:11:07,976 HAVE BECOME AN URBAN PHENOMENON. 181 00:11:07,977 --> 00:11:10,746 WITH EACH FLOOR ADDED TO THE GARAGE 182 00:11:10,747 --> 00:11:14,449 THE NUMBER OF PARKING SPACES INCREASES. 183 00:11:14,450 --> 00:11:16,818 IN CROWDED CITIES WHERE LAND IS LIMITED, 184 00:11:16,819 --> 00:11:19,856 GARAGES LIKE THESE ARE A NECESSITY. 185 00:11:24,359 --> 00:11:28,597 THEY BUILD PARKING GARAGES ONE CONCRETE SLAB AT A TIME. 186 00:11:28,598 --> 00:11:30,933 THESE SLABS ARE KNOWN AS DOUBLE-T's 187 00:11:30,934 --> 00:11:35,670 BECAUSE THE TWO SUPPORT BEAMS ARE IN A DOUBLE-T CONFIGURATION. 188 00:11:35,671 --> 00:11:38,306 DOUBLE-T'S ARE OFTEN FACTORY MADE 189 00:11:38,307 --> 00:11:41,208 AND TRANSPORTED TO THE CONSTRUCTION SITE LATER. 190 00:11:41,209 --> 00:11:44,748 THEY ARE DESIGNED TO HOLD UP UNDER VERY HEAVY LOADS. 191 00:11:46,181 --> 00:11:49,016 THEY MAKE THESE SLABS OUTDOORS. 192 00:11:49,017 --> 00:11:53,122 WIND BLOWS DIRT ONTO THE MOLDS, SO THEY SWEEP IT CLEAN. 193 00:11:53,123 --> 00:11:55,756 THIS MOLD IS ABOUT 500 FEET LONG 194 00:11:55,757 --> 00:11:59,960 AND WILL BE USED TO MAKE SEVERAL SLABS. 195 00:11:59,961 --> 00:12:03,164 THEY SPRAY AN OIL-BASED RELEASE AGENT ONTO IT. 196 00:12:03,165 --> 00:12:06,668 THE RELEASE AGENT WILL ALLOW THE SLABS TO BE EASILY EXTRACTED 197 00:12:06,669 --> 00:12:09,503 WHEN COMPLETE, PREVENTING CRACKING. 198 00:12:09,504 --> 00:12:13,274 THEY SPREAD IT MORE EVENLY USING MOPS. 199 00:12:13,275 --> 00:12:16,477 THIS RELEASE AGENT BONDS TO THE METAL QUICKLY 200 00:12:16,478 --> 00:12:19,916 AND WON'T WASH OFF EASILY IF IT HAPPENS TO RAIN. 201 00:12:22,551 --> 00:12:23,952 THEY'RE NOW READY TO ASSEMBLE 202 00:12:23,953 --> 00:12:27,290 THE FLOOR SLAB'S ELABORATE SUPPORT STRUCTURE. 203 00:12:28,424 --> 00:12:30,625 THEY PROP UP THE ENDS OF EACH SLAB 204 00:12:30,626 --> 00:12:32,929 WITH GALVANIZED STEEL STIRRUPS. 205 00:12:36,965 --> 00:12:40,101 THEY PLACE L-SHAPED BEARING PLATES 206 00:12:40,102 --> 00:12:43,139 IN STRATEGIC LOCATIONS ALONG THE MOLD. 207 00:12:46,575 --> 00:12:49,810 THEN THEY INSERT WOODEN BLOCKS IN THE MOLD. 208 00:12:49,811 --> 00:12:53,347 THESE BLOCKS WILL FORM NOTCHES IN THE CAST CONCRETE 209 00:12:53,348 --> 00:12:57,020 THAT WILL BE USED TO JOIN THE SLABS DURING CONSTRUCTION. 210 00:12:59,421 --> 00:13:02,423 NEXT, WORKERS THREAD HIGH-STRENGTH STEEL CABLES 211 00:13:02,424 --> 00:13:05,928 CALLED TENDONS THROUGHOUT THE BEAM SECTIONS OF THE MOLD. 212 00:13:05,929 --> 00:13:10,264 THEY PULL THE ENDS THROUGH HOLES TO THE OUTSIDE OF THE MOLD 213 00:13:10,265 --> 00:13:11,835 AND CLAMP THEM. 214 00:13:15,336 --> 00:13:19,641 A WORKER TUCKS ANOTHER WOOD BLOCK BETWEEN TWO TENDONS 215 00:13:19,642 --> 00:13:21,075 TO COMPLETE THE NOTCH PART OF THE MOLD 216 00:13:21,076 --> 00:13:23,579 AND HOLD THE TENDONS IN PLACE. 217 00:13:25,281 --> 00:13:27,848 THE TEAM THREADS MORE TENDONS THROUGHOUT THE MOLD, 218 00:13:27,849 --> 00:13:31,286 WEAVING A STRATEGIC SUPPORT STRUCTURE. 219 00:13:36,191 --> 00:13:40,160 TO SEPARATE EACH CAST SLAB, THEY INSERT WOODEN DIVIDERS 220 00:13:40,161 --> 00:13:42,865 WITH SLOTS THAT ACCOMMODATE THE TENDONS. 221 00:13:47,969 --> 00:13:50,771 THEY ADJUST THE LOCATION OF EACH OF THE STIRRUPS 222 00:13:50,772 --> 00:13:55,675 SO THAT THEY SIT AT A SPECIFIC SPOT NEAR THE DIVIDERS. 223 00:14:01,983 --> 00:14:06,823 WITH THE FINAL TENDONS IN PLACE, THEY BRING IN A HYDRAULIC JACK. 224 00:14:09,993 --> 00:14:14,162 THE WORKER ATTACHES IT TO ONE OF THE PROTRUDING STEEL TENDONS. 225 00:14:17,199 --> 00:14:20,202 HE ACTIVATES THE JACK, AND IT PULLS THE TENDON 226 00:14:20,203 --> 00:14:22,471 UNTIL IT'S STRETCHED TIGHT LIKE A RUBBER BAND. 227 00:14:26,175 --> 00:14:29,544 HE PULLS THE REST OF THE TENDONS WITH THE JACK 228 00:14:29,545 --> 00:14:31,478 AND CHECKS THE TENSION TO CONFIRM 229 00:14:31,479 --> 00:14:34,450 THAT IT'S EXACTLY THE SAME FOR EACH ONE. 230 00:14:37,286 --> 00:14:39,453 PULLED TIGHT AND LATER RELEASED, 231 00:14:39,454 --> 00:14:42,223 THE CABLES WILL HOLD THE CONCRETE UNDER COMPRESSION, 232 00:14:42,224 --> 00:14:44,060 ADDING STRENGTH TO IT. 233 00:14:47,963 --> 00:14:50,265 WITHOUT IT, THE CONCRETE SLABS 234 00:14:50,266 --> 00:14:54,969 WOULD NEVER BE ABLE TO SUPPORT THE WEIGHT OF MANY VEHICLES. 235 00:14:54,970 --> 00:14:58,306 THE NEXT WORKER TIES A PLASTIC BRACKET TO THE STIRRUPS 236 00:14:58,307 --> 00:15:00,342 TO SET THEM AT THE RIGHT HEIGHT. 237 00:15:04,847 --> 00:15:07,647 HE INSERTS METAL MESH INTO THE MOLD 238 00:15:07,648 --> 00:15:09,851 WHERE EACH SLAB WILL END. 239 00:15:09,852 --> 00:15:11,618 THIS WILL HELP DISPERSE 240 00:15:11,619 --> 00:15:15,022 SOME OF THE CONCENTRATED BEARING STRESSES. 241 00:15:15,023 --> 00:15:17,025 HE STABILIZES THE MESH, 242 00:15:17,026 --> 00:15:19,796 AND REINFORCES IT WITH THE SUPPORT STRUCTURE. 243 00:15:25,200 --> 00:15:27,334 THE TEAM PLACES PLASTIC POCKETS 244 00:15:27,335 --> 00:15:30,440 ALONG THE TOPS OF THE BEAM SECTIONS OF THE MOLD. 245 00:15:33,041 --> 00:15:35,977 THESE POCKETS WILL BE USED TO CHAIN THE SLAB TO THE TRUCK 246 00:15:35,978 --> 00:15:38,346 DURING TRANSPORT. 247 00:15:38,347 --> 00:15:41,449 THEY'LL ALSO ACT AS ENTRY POINTS FOR ELECTRICAL WIRING 248 00:15:41,450 --> 00:15:45,121 AND HOLD CONTROLS FOR PARKING SPACE COUNTING EQUIPMENT. 249 00:15:50,224 --> 00:15:51,693 COMING UP NEXT, 250 00:15:51,694 --> 00:15:54,697 THE DECK SECTION GETS PLENTY OF EXTRA SUPPORT, 251 00:15:54,698 --> 00:15:57,200 AND THEN IT'S SET IN CONCRETE. 252 00:16:08,810 --> 00:16:10,779 Narrator: THE AVERAGE CAR WEIGHS WELL OVER 2,000 POUNDS, 253 00:16:10,780 --> 00:16:12,481 SO EACH PARKING GARAGE FLOOR 254 00:16:12,482 --> 00:16:14,449 MUST HOLD UP MANY TIMES THAT WEIGHT. 255 00:16:14,450 --> 00:16:17,218 DOUBLE-T CONCRETE SLABS MAKE THIS POSSIBLE. 256 00:16:17,219 --> 00:16:19,987 EACH SLAB HAS TWO REINFORCING BEAMS, 257 00:16:19,988 --> 00:16:22,589 AND EACH BEAM HAS A TENSE STEEL SKELETON 258 00:16:22,590 --> 00:16:26,094 THAT COMPRESSES THE CONCRETE, MAKING IT STRONGER. 259 00:16:29,000 --> 00:16:30,234 WITH THE STEEL TENDONS 260 00:16:30,235 --> 00:16:32,436 STRETCHED THROUGH THE BEAM PARTS OF THE MOLD, 261 00:16:32,437 --> 00:16:36,141 WORKERS NOW LAY METAL MESH ACROSS THE DECK. 262 00:16:36,142 --> 00:16:39,543 THIS MESH IS KNOWN AS WELDED WIRE FABRIC, 263 00:16:39,544 --> 00:16:43,115 AND IT WILL REINFORCE THE SURFACE OF THE PARKING SLAB. 264 00:16:45,451 --> 00:16:48,420 THEY TIE THE WELDED WIRE TOGETHER 265 00:16:48,421 --> 00:16:50,990 FOR FULL COVERAGE ACROSS THE DECK. 266 00:16:53,192 --> 00:16:56,461 THEY USE PLASTIC CLIPS TO PROP UP THE WIRE 267 00:16:56,462 --> 00:16:57,896 SO THAT WHEN THEY POUR THE CONCRETE, 268 00:16:57,897 --> 00:17:00,266 IT WILL ENVELOP BOTH SIDES. 269 00:17:02,100 --> 00:17:03,969 THEY INSERT HANDLES 270 00:17:03,970 --> 00:17:06,639 THAT WILL PROTRUDE FROM THE ENDS OF THE COMPLETED SLAB 271 00:17:06,640 --> 00:17:10,308 TO ALLOW IT TO BE LIFTED FOR TRANSPORT AND INSTALLATION. 272 00:17:10,309 --> 00:17:15,214 THERE ARE FOUR DOUBLE HANDLES IN EACH PARKING FLOOR SLAB. 273 00:17:17,615 --> 00:17:22,787 THEY ENMESH THE PRONGS OF WELD PLATES IN THE STEEL GRID. 274 00:17:22,788 --> 00:17:25,123 THE PLATES ARE STRATEGICALLY POSITIONED 275 00:17:25,124 --> 00:17:28,894 FOR THE WELDING OF THE SLAB TO OTHER PIECES OF CONCRETE. 276 00:17:30,797 --> 00:17:33,832 ALL THE PREP WORK IS FINALLY DONE, 277 00:17:33,833 --> 00:17:35,969 AND THEY POUR THE CONCRETE. 278 00:17:38,069 --> 00:17:41,906 THE CONCRETE FLOWS INTO THE BEAM SECTIONS OF THE MOLD FIRST, 279 00:17:41,907 --> 00:17:45,677 AND THEN WORKERS SPREAD THE OVERFLOW ACROSS THE DECK. 280 00:17:45,678 --> 00:17:47,813 THIS IS A HIGH-PERFORMANCE FORMULA 281 00:17:47,814 --> 00:17:52,016 THAT'S KNOWN IN THE INDUSTRY AS SELF-CONSOLIDATING CONCRETE. 282 00:17:52,017 --> 00:17:54,719 IT FLOWS EVENLY INTO TIGHT SPACES 283 00:17:54,720 --> 00:17:59,190 AND COMPACTS BETTER WITHOUT THE NEED FOR MUCH VIBRATING. 284 00:17:59,191 --> 00:18:02,093 THIS LEVELER VIBRATES THE SURFACE OF THE CONCRETE 285 00:18:02,094 --> 00:18:04,931 ONLY SLIGHTLY AS IT EVENS IT OUT. 286 00:18:08,099 --> 00:18:10,434 THEY THEN RAKE THE SURFACE OF THE SLAB 287 00:18:10,435 --> 00:18:13,304 TO ALLOW ANOTHER LAYER OF CONCRETE TO ADHERE TO IT 288 00:18:13,305 --> 00:18:15,275 LATER DURING CONSTRUCTION. 289 00:18:20,279 --> 00:18:22,279 THEY NOW INSERT ARCED METAL BARS 290 00:18:22,280 --> 00:18:24,716 INTO SLOTS ON THE SIDES OF THE MOLD 291 00:18:24,717 --> 00:18:27,854 TO FORM A RIBBED FRAMEWORK DOWN THE LENGTH OF IT. 292 00:18:29,788 --> 00:18:32,856 THIS SERVES AS A SUPPORT STRUCTURE FOR A TENT. 293 00:18:32,857 --> 00:18:35,093 THEY UNROLL THE TARP FROM A HUGE SPOOL 294 00:18:35,094 --> 00:18:37,029 AND DRAPE IT OVER THE RIBBING. 295 00:18:42,134 --> 00:18:44,870 THEY SECURE THE CANVAS TO THE SIDES OF THE MOLD 296 00:18:44,871 --> 00:18:46,639 WITH HOOKS. 297 00:18:48,406 --> 00:18:50,541 THE TENT WILL SHELTER THE CONCRETE 298 00:18:50,542 --> 00:18:52,978 FROM THE WIND AND RAIN AS IT CURES. 299 00:18:55,547 --> 00:18:57,882 ALONG WITH AN ADDITIONAL PLASTIC LAYER, 300 00:18:57,883 --> 00:19:01,853 IT WILL CONTAIN THE HOT AND HUMID CONDITIONS CREATED INSIDE. 301 00:19:01,854 --> 00:19:04,721 THE HEAT ACCELERATES THE CURING OF THE CONCRETE, 302 00:19:04,722 --> 00:19:08,558 AND THE HUMIDITY PREVENTS CRACKING. 303 00:19:08,559 --> 00:19:13,066 THE CURE TAKES 16 HOURS, AND THEN THEY ROLL UP THE TARP. 304 00:19:16,634 --> 00:19:19,571 USING A TORCH, THEY CUT THE STEEL TENDONS 305 00:19:19,572 --> 00:19:23,074 AND PLACE THE CONCRETE UNDER COMPRESSION. 306 00:19:23,075 --> 00:19:26,278 THE CUTS ALSO SEPARATE THE SLABS. 307 00:19:27,913 --> 00:19:31,683 A DRIVER NOW PARKS HIS CRANE OVER ONE OF THE SLABS. 308 00:19:34,420 --> 00:19:36,555 WORKERS ATTACH THE HOOKS OF THE CRANE 309 00:19:36,556 --> 00:19:39,893 TO THE PROTRUDING HANDLES AT THE ENDS OF THE SLAB. 310 00:19:42,394 --> 00:19:46,764 THEY SIGNAL THE CRANE OPERATOR, AND HE ACTIVATES THE LIFT. 311 00:19:46,765 --> 00:19:49,133 THANKS TO THE RELEASE AGENT APPLIED EARLIER, 312 00:19:49,134 --> 00:19:52,604 THE CONCRETE SLAB EASILY DISLODGES FROM THE MOLD. 313 00:19:52,605 --> 00:19:54,137 IT'S A HEAVY LOAD. 314 00:19:54,138 --> 00:19:56,742 EACH SLAB WEIGHS 40,000 POUNDS. 315 00:19:59,243 --> 00:20:01,579 THE CRANE SETS IT DOWN 316 00:20:01,580 --> 00:20:04,783 AND THE TEAM INSPECTS THE SLAB FOR DEFECTS. 317 00:20:07,519 --> 00:20:10,489 SATISFIED THAT THE SLAB IS FREE OF FLAWS, 318 00:20:10,490 --> 00:20:12,957 A WORKER TRIMS THE PROTRUDING STEEL TENDONS 319 00:20:12,958 --> 00:20:14,928 FLUSH TO THE CONCRETE. 320 00:20:17,896 --> 00:20:20,765 ANOTHER WORKER SPREADS A CONCRETE-LIKE PASTE 321 00:20:20,766 --> 00:20:23,369 ON THE EXPOSED ENDS OF THE SEVERED STEEL 322 00:20:23,370 --> 00:20:25,471 TO SEAL IT FROM THE ELEMENTS. 323 00:20:30,910 --> 00:20:35,512 THEN A WORKER GLUES RUBBER PADS TO THE BEARING PLATES. 324 00:20:35,513 --> 00:20:36,780 THEY'LL ACT AS CUSHIONS 325 00:20:36,781 --> 00:20:39,316 WHEN THE SLAB SITS ON ANOTHER CONCRETE BEAM. 326 00:20:39,317 --> 00:20:43,956 HE WRAPS SOME TAPE AROUND THEM WHILE THE ADHESIVE SETS. 327 00:20:46,992 --> 00:20:51,996 THIS PARKING GARAGE FLOOR SLAB IS NOW READY TO JOIN THE REST. 328 00:20:51,997 --> 00:20:53,265 SIDE-BY-SIDE, 329 00:20:53,266 --> 00:20:56,401 THE SLABS WILL FORM ONE LARGE PARKING SURFACE 330 00:20:56,402 --> 00:20:59,038 TO CREATE EVEN MORE SPACES. 331 00:21:12,285 --> 00:21:14,553 IF YOU HAVE ANY COMMENTS ABOUT THE SHOW, 332 00:21:14,554 --> 00:21:17,421 OR IF YOU'D LIKE TO SUGGEST TOPICS FOR FUTURE SHOWS, 333 00:21:17,422 --> 00:21:21,126 DROP US A LINE AT...