1 00:00:01,536 --> 00:00:04,603 -- Captions by VITAC -- www.vitac.com 2 00:00:04,606 --> 00:00:07,539 CAPTIONS PAID FOR BY DISCOVERY COMMUNICATIONS 3 00:00:07,542 --> 00:00:14,946 ♪ 4 00:00:14,949 --> 00:00:22,354 ♪ 5 00:00:45,779 --> 00:00:53,184 ♪ 6 00:00:53,187 --> 00:00:55,120 Narrator: GUITAR PICKUPS WERE INVENTED 7 00:00:55,123 --> 00:00:57,589 DURING THE TIME OF THE BIG-BAND ERA. 8 00:00:57,592 --> 00:01:02,460 JAZZ MUSIC INCORPORATED BOTH GUITAR AND LARGE BRASS SECTIONS. 9 00:01:02,463 --> 00:01:04,929 TO OFFSET A GUITAR'S MELLOW TONES, 10 00:01:04,932 --> 00:01:08,667 A PICKUP DEVICE WAS DEVELOPED TO AMPLIFY THE VIBRATION 11 00:01:08,670 --> 00:01:12,137 OF THE GUITAR'S STRINGS, GENERATING A LOUDER SOUND. 12 00:01:14,275 --> 00:01:18,209 THE GUITAR PICKUP WAS INVENTED IN THE EARLY 20th CENTURY. 13 00:01:18,212 --> 00:01:21,613 THE DEVICE ALLOWED MUSICIANS TO PLUG INTO A NEW SOUND 14 00:01:21,616 --> 00:01:25,684 THAT WOULD LATER DEFINE ROCK 'N' ROLL. 15 00:01:25,687 --> 00:01:28,920 PRODUCTION STARTS WITH AN EDGED STEEL PART. 16 00:01:31,092 --> 00:01:33,558 A TECHNICIAN APPLIES GLUE TO THE SPINE 17 00:01:33,561 --> 00:01:35,293 AND ATTACHES PLASTIC STRIPS 18 00:01:35,296 --> 00:01:38,897 TO THE GLUED AREAS FOR FULL ADHESION. 19 00:01:38,900 --> 00:01:42,300 HE GLUES A SECOND EDGED STEEL PART TO THE FIRST, 20 00:01:42,303 --> 00:01:45,003 CREATING A BOBBIN FOR WIRE WINDINGS. 21 00:01:49,644 --> 00:01:51,709 HE APPLIES CLEAR POLYESTER TAPE 22 00:01:51,712 --> 00:01:54,112 ALONG THE INNER EDGES OF THE BOBBIN. 23 00:01:54,115 --> 00:01:57,115 THE TAPE WILL SERVE AS ELECTRICAL INSULATION, 24 00:01:57,118 --> 00:01:59,183 SUPPLEMENTING AN INSULATING COATING 25 00:01:59,186 --> 00:02:01,119 THAT'S BEEN APPLIED TO THE METAL. 26 00:02:03,191 --> 00:02:06,190 USING AN ABRASIVE WHEEL, HE SCUFFS OFF THE FINISH 27 00:02:06,193 --> 00:02:09,394 ON THE END OF THE BOBBIN TO PREPARE IT FOR SOLDERING. 28 00:02:14,335 --> 00:02:18,202 THE SCUFFED BOBBIN IS THE ONE ON THE LEFT. 29 00:02:18,205 --> 00:02:21,439 THEN THE BOBBIN IS MOUNTED TO A WINDING MANDREL. 30 00:02:24,411 --> 00:02:26,878 THE CRAFTSMAN WRAPS THIN COPPER WIRE 31 00:02:26,881 --> 00:02:28,813 AROUND THE END OF THE BOBBIN 32 00:02:28,816 --> 00:02:31,349 AND ACTIVATES THE WINDING MANDREL. 33 00:02:31,352 --> 00:02:35,019 AS THE MANDREL SPINS, THE BOBBIN GATHERS THE COPPER WIRE 34 00:02:35,022 --> 00:02:39,090 TOGETHER TO PRODUCE A WAD THAT'S 4,000 WINDINGS THICK. 35 00:02:39,093 --> 00:02:45,430 ♪ 36 00:02:45,433 --> 00:02:48,833 THE BOBBIN CONTAINING THOUSANDS OF COPPER-WIRE WINDINGS 37 00:02:48,836 --> 00:02:53,104 HAS CREATED A PATH FOR MAGNETIC ENERGY. 38 00:02:53,107 --> 00:02:58,175 NEXT, THE ENDS OF THE COPPER WIRE ARE SOLDERED TO THE BOBBIN. 39 00:02:58,178 --> 00:03:01,312 THE CRAFTSMAN APPLIES A DIRECT CURRENT THROUGH THE COIL 40 00:03:01,315 --> 00:03:04,182 AND MEASURES THE ELECTRICAL RESISTANCE. 41 00:03:04,185 --> 00:03:07,318 ONCE THE CURRENT FALLS WITHIN THE ACCEPTABLE RANGE, 42 00:03:07,321 --> 00:03:10,255 HE SOLDERS CONNECTION CABLES TO THE WINDINGS. 43 00:03:13,327 --> 00:03:16,928 THEN THE COIL IS SUBMERGED IN HOT LIQUID WAX. 44 00:03:16,931 --> 00:03:19,330 THE WAX WILL ENCASE THE WIRE WINDINGS 45 00:03:19,333 --> 00:03:22,733 TO PREVENT MECHANICAL VIBRATIONS. 46 00:03:22,736 --> 00:03:27,938 NEXT, THE CRAFTSMAN INSERTS BRASS PINS INTO A PRESS FIXTURE. 47 00:03:27,941 --> 00:03:31,008 HE PLACES A STEEL CHANNEL ON TOP OF THE PINS, 48 00:03:31,011 --> 00:03:33,812 PIERCING THE PINS THROUGH THE CHANNEL. 49 00:03:33,815 --> 00:03:36,547 HE FLATTENS THE HEADS OF THE PINS WITH THE PRESS 50 00:03:36,550 --> 00:03:40,351 WHILE ALLOWING THE ENDS TO EXTEND THROUGH THE CHANNEL. 51 00:03:40,354 --> 00:03:42,286 TO STABILIZE THE ASSEMBLY, 52 00:03:42,289 --> 00:03:44,355 HE PLACES RUBBER AND STEEL WASHERS 53 00:03:44,358 --> 00:03:46,458 OVER THE PROTRUDING PINS. 54 00:03:48,629 --> 00:03:52,496 HE MOUNTS A BRASS PLATE TO THE PINS AND ADDS MORE WASHERS 55 00:03:52,499 --> 00:03:54,899 TO ELECTRICALLY GROUND THE ASSEMBLY. 56 00:03:58,238 --> 00:04:01,239 THE CRAFTSMAN PRESSES THE PINS TO FLATTEN THEM, 57 00:04:01,242 --> 00:04:04,042 SECURING THE PLATE TO THE CHANNEL. 58 00:04:04,045 --> 00:04:06,777 A SECOND STEEL CHANNEL IS ATTACHED TO THE PLATE 59 00:04:06,780 --> 00:04:09,514 ON TOP OF THE FIRST CHANNEL. 60 00:04:09,517 --> 00:04:12,917 THE DUAL COIL ASSEMBLY CONTAINS A HIGHER OUTPUT 61 00:04:12,920 --> 00:04:17,789 AND WILL COUNTERACT ELECTROMAGNETIC INTERFERENCE. 62 00:04:17,792 --> 00:04:21,392 WHILE MOST PICKUPS HAVE MAGNETS INSIDE THE COILS, 63 00:04:21,395 --> 00:04:25,396 THIS PICKUP CONTAINS MAGNETS ON THE OUTSIDE OF THE COILS. 64 00:04:25,399 --> 00:04:28,967 THIS DESIGN REDUCES HUM FROM ELECTRICAL INTERFERENCE. 65 00:04:31,272 --> 00:04:34,271 THE CRAFTSMAN SOLDERS A GROUND WIRE TO THE UNIT 66 00:04:34,274 --> 00:04:36,607 AND APPLIES MORE SOLDER TO ONE OF THE PINS 67 00:04:36,610 --> 00:04:40,211 TO CONNECT THE COIL CABLES. 68 00:04:40,214 --> 00:04:42,981 THE COILS ARE INSERTED IN THE CHANNELS. 69 00:04:45,219 --> 00:04:47,218 A BURNT-CHROME FINISH CAN BE APPLIED 70 00:04:47,221 --> 00:04:49,353 TO THE PICKUP'S OUTER CASING. 71 00:04:49,356 --> 00:04:52,357 THE BURNT-CHROME CASING PRODUCES A DISCOLORATION 72 00:04:52,360 --> 00:04:55,159 THAT ADDS VISUAL INTEREST. 73 00:04:55,162 --> 00:04:59,697 HE NOW PIPES A GENEROUS AMOUNT OF EPOXY INTO THE CASING CAVITY 74 00:04:59,700 --> 00:05:03,034 AND INSERTS THE PICKUP. 75 00:05:03,037 --> 00:05:05,570 HE SOLDERS WIRE FROM THE COVER TO THE PICKUP 76 00:05:05,573 --> 00:05:07,772 TO GROUND THE UNIT. 77 00:05:07,775 --> 00:05:10,908 THE PICKUP IS PLACED OVER THE STRINGS OF A GUITAR, 78 00:05:10,911 --> 00:05:13,177 AND HE PLUGS IT INTO AN AMPLIFIER. 79 00:05:13,180 --> 00:05:15,446 [ GUITAR PLAYING ] 80 00:05:15,449 --> 00:05:17,916 ONCE HE CONFIRMS THE TONE IS ACCEPTABLE, 81 00:05:17,919 --> 00:05:20,185 HE MEASURES THE RESISTANCE. 82 00:05:21,055 --> 00:05:22,720 THE CRAFTSMAN TESTS THE DIRECTION 83 00:05:22,723 --> 00:05:25,123 THE CURRENT TRAVELS THROUGH THE PICKUP. 84 00:05:25,126 --> 00:05:27,191 THIS METHOD IS CALLED PHASE. 85 00:05:27,194 --> 00:05:30,395 HE ALSO ASSESSES THE STRENGTH OF THE MAGNETIC FIELD 86 00:05:30,398 --> 00:05:33,998 THROUGH A METHOD KNOWN AS POLARITY. 87 00:05:34,001 --> 00:05:36,067 EVEN THOUGH IT'S TAKEN JUST 15 MINUTES 88 00:05:36,070 --> 00:05:38,002 TO MAKE THIS GUITAR PICKUP, 89 00:05:38,005 --> 00:05:41,673 DUE TO ITS SUSTAINABILITY, IT SHOULD LAST FOR YEARS, 90 00:05:41,676 --> 00:05:45,142 PROVIDING MUSICIANS WITH PLENTY OF GOOD VIBES. 91 00:05:45,145 --> 00:05:46,678 [ GUITAR PLAYING ] 92 00:05:53,621 --> 00:05:59,090 ♪ 93 00:05:59,093 --> 00:06:01,158 Narrator: WHEN YOU'RE SITTING OUTDOORS 94 00:06:01,161 --> 00:06:02,827 AND IT STARTS GETTING CHILLY, 95 00:06:02,830 --> 00:06:05,829 YOU CAN SHIVER, PUT ON MORE LAYERS OF CLOTHING, 96 00:06:05,832 --> 00:06:07,632 OR PRESS A BUTTON TO LET THE FURNITURE 97 00:06:07,635 --> 00:06:09,767 YOU'RE SITTING ON WARM YOU UP. 98 00:06:09,770 --> 00:06:13,905 DESIGNED FOR USE IN THE OUTDOORS AND IN COLDER INDOOR SPACES, 99 00:06:13,908 --> 00:06:16,674 HEATED FURNITURE IS A HOT NEW TREND. 100 00:06:18,980 --> 00:06:22,179 THIS HEATED LOUNGE IS HIP AND PRACTICAL. 101 00:06:22,182 --> 00:06:25,449 DISCREET DRAIN HOLES PREVENT RAINWATER FROM PUDDLING, 102 00:06:25,452 --> 00:06:27,785 AND THE EASY-TO-REACH HEAT CONTROL KNOB 103 00:06:27,788 --> 00:06:30,321 IS LOCATED UNDERNEATH THE SEAT. 104 00:06:30,324 --> 00:06:32,323 BENCHES, MULTI-SEAT LOUNGES, 105 00:06:32,326 --> 00:06:37,128 AND SINGLE CHAIRS CAN ALL BE MADE INTO HEATED FURNITURE. 106 00:06:37,131 --> 00:06:39,664 THE FIRST STEP IS TO COAT A FIBERGLASS MOLD 107 00:06:39,667 --> 00:06:41,999 WITH A RELEASE AGENT. 108 00:06:42,936 --> 00:06:45,870 ONCE A RUBBER INSERT IS GLUED INTO THE DRAIN HOLE, 109 00:06:45,873 --> 00:06:47,871 A TECHNICIAN MIXES THE INGREDIENTS 110 00:06:47,874 --> 00:06:50,341 FOR THE CASTING MATERIAL TOGETHER. 111 00:06:50,344 --> 00:06:53,611 INGREDIENTS INCLUDE PIGMENT CONTAINING METAL OXIDES, 112 00:06:53,614 --> 00:06:57,015 WHICH PREVENT COLOR FADING, A CONCRETE MIX CONTAINING 113 00:06:57,018 --> 00:07:00,351 A BLEND OF FIBERS FOR EXTRA STRENGTH AND RESISTANCE, 114 00:07:00,354 --> 00:07:04,022 AND WATER CONTAINING PROPRIETARY ADDITIVES. 115 00:07:04,025 --> 00:07:07,558 THE INGREDIENTS ARE MIXED TOGETHER FOR ABOUT THREE MINUTES 116 00:07:07,561 --> 00:07:12,096 UNTIL THE CONCRETE IS THE CONSISTENCY OF CAKE BATTER. 117 00:07:12,099 --> 00:07:15,366 A THIN LAYER IS SPRAYED ON TO THE FIBERGLASS MOLD, 118 00:07:15,369 --> 00:07:19,337 AND ANY RAISED AREAS ARE FLATTENED TO REMOVE AIR BUBBLES. 119 00:07:22,109 --> 00:07:25,242 THE CHAIR'S COLOR WILL NEVER RUB OFF OR PEEL 120 00:07:25,245 --> 00:07:29,781 BECAUSE THE PIGMENT IS MIXED RIGHT INTO THE CONCRETE. 121 00:07:29,784 --> 00:07:32,616 NEXT, TECHNICIANS ADD THE HEATING ELEMENT, 122 00:07:32,619 --> 00:07:36,120 A CABLE THAT IS WRAPPED AROUND THE PIECE OF FURNITURE. 123 00:07:36,123 --> 00:07:39,724 THE CABLE IS TACKED IN PLACE WITH A SEPARATE MIX OF CONCRETE 124 00:07:39,727 --> 00:07:42,593 THAT HAS A HIGHER FIBER CONTENT. 125 00:07:42,596 --> 00:07:45,796 THE ENTIRE HEATING ELEMENT IS EMBEDDED IN A FULL COAT 126 00:07:45,799 --> 00:07:47,931 OF THE HIGH-FIBER CONCRETE. 127 00:07:47,934 --> 00:07:50,935 THEN A FINISHING COAT OF THE FIRST MIX IS APPLIED, 128 00:07:50,938 --> 00:07:53,537 AND THE STRUCTURE IS LEFT TO CURE AT ROOM TEMPERATURE 129 00:07:53,540 --> 00:07:55,807 FOR 24 HOURS. 130 00:07:55,810 --> 00:08:00,144 NOW CURED, THIS WHITE CHAIR IS READY TO BE EXTRACTED. 131 00:08:00,147 --> 00:08:02,079 A TECHNICIAN PUMPS COMPRESSED AIR 132 00:08:02,082 --> 00:08:04,148 THROUGH THE DRAIN-HOLE INSERT. 133 00:08:04,151 --> 00:08:06,417 DUE TO THE RELEASE AGENT APPLICATION, 134 00:08:06,420 --> 00:08:09,854 THE CAST CHAIR EASILY POPS OFF THE MOLD. 135 00:08:10,958 --> 00:08:14,559 THE ROUGH EDGES ARE SMOOTHED WITH A DIAMOND FILE. 136 00:08:17,030 --> 00:08:19,563 THEN THE DRAIN-HOLE PLUG IS REMOVED. 137 00:08:19,566 --> 00:08:24,568 ♪ 138 00:08:24,571 --> 00:08:28,105 AT ANOTHER STATION, A TECHNICIAN COATS THE ENTIRE SURFACE 139 00:08:28,108 --> 00:08:31,843 OF ANOTHER CHAIR WITH A SEALANT THAT BLOCKS MOISTURE. 140 00:08:31,846 --> 00:08:34,512 MOISTURE PENETRATION WEAKENS CONCRETE 141 00:08:34,515 --> 00:08:38,983 AND DRAWS OUT THE NATURAL SALT, WHICH LEAVES WHITE STAINS. 142 00:08:38,986 --> 00:08:43,054 MEANWHILE, A WELDER CONSTRUCTS THE CHAIR'S FRAME WITH PARTS 143 00:08:43,057 --> 00:08:46,523 MADE OUT OF STAINLESS-STEEL TUBES AND PLATES. 144 00:08:46,526 --> 00:08:49,593 THE CHAIR HAS THREE LEGS, PLUS CROSS MEMBERS 145 00:08:49,596 --> 00:08:52,663 THAT ACT AS CONDUITS FOR ELECTRICAL WIRES. 146 00:08:52,666 --> 00:08:55,866 THE CROSS MEMBERS CONNECT TO A STAINLESS-STEEL BOX, 147 00:08:55,869 --> 00:08:58,536 WHICH WILL HOUSE THE TEMPERATURE CONTROL UNIT. 148 00:08:58,539 --> 00:09:03,808 ♪ 149 00:09:03,811 --> 00:09:06,143 A TECHNICIAN FILLS THE CHANNEL WITH ADHESIVE 150 00:09:06,146 --> 00:09:07,812 ALONG THE PERIMETER. 151 00:09:10,350 --> 00:09:14,218 HE PLACES THE FRAME INTO THE CHANNEL. 152 00:09:14,221 --> 00:09:17,221 THE ADHESIVE WILL TAKE A DAY TO CURE. 153 00:09:18,225 --> 00:09:20,958 NEXT, THE ELECTRICAL WIRING IS ASSEMBLED. 154 00:09:20,961 --> 00:09:23,361 THE TECHNICIAN FISHES TWO ELECTRICAL WIRES 155 00:09:23,364 --> 00:09:24,762 THROUGH THE FRAME. 156 00:09:24,765 --> 00:09:26,831 ONE WIRE CONNECTS THE POWER-CORD PLUG 157 00:09:26,834 --> 00:09:28,900 TO THE TEMPERATURE CONTROL UNIT. 158 00:09:28,903 --> 00:09:31,335 THE OTHER RUNS FROM THE TEMPERATURE CONTROL UNIT 159 00:09:31,338 --> 00:09:33,637 TO THE TEMPERATURE CONTROL SWITCH. 160 00:09:33,640 --> 00:09:37,908 HE GLUES THE SWITCH INTO A HOLE IN THE RIGHT FRONT LEG. 161 00:09:37,911 --> 00:09:41,746 ALL THE WIRES ARE EMBEDDED IN RUBBER, MAKING THEM WATERPROOF. 162 00:09:45,319 --> 00:09:48,252 THE TEMPERATURE CONTROL UNIT IS INSTALLED IN THE BOX 163 00:09:48,255 --> 00:09:51,121 AT THE CENTER OF THE FRAME. 164 00:09:51,124 --> 00:09:54,759 THEN A TEMPERATURE SENSOR IS INSTALLED UNDERNEATH THE SEAT. 165 00:09:57,198 --> 00:10:00,531 THE TECHNICIAN HAMMERS PLASTIC AND STAINLESS-STEEL FEET 166 00:10:00,534 --> 00:10:02,600 INTO THE BOTTOM OF THE LEGS. 167 00:10:02,603 --> 00:10:05,469 THIS PREVENTS THE LEGS FROM SCRATCHING THE FLOOR 168 00:10:05,472 --> 00:10:09,340 AND LEVELS THE FURNITURE ON AN UNEVEN SURFACE. 169 00:10:10,277 --> 00:10:15,213 LASTLY, A BRONZE DRAIN IS INSERTED INTO THE DRAIN HOLE. 170 00:10:15,216 --> 00:10:18,749 A QUALITY CONTROLLED HEAT TEST MEASURES THE SURFACE TEMPERATURE 171 00:10:18,752 --> 00:10:20,685 WITH AN INFRARED THERMOMETER. 172 00:10:22,957 --> 00:10:26,490 IF ALL IS OPERATING CORRECTLY, THE SENSOR UNDER THE SEAT 173 00:10:26,493 --> 00:10:29,693 TELLS THE THERMOSTAT AND THE TEMPERATURE CONTROL UNIT 174 00:10:29,696 --> 00:10:32,663 WHEN TO TURN THE HEAT ON OR OFF. 175 00:10:40,508 --> 00:10:45,342 ♪ 176 00:10:45,345 --> 00:10:47,711 Narrator: EVER SINCE THE ANCIENT EGYPTIANS DEVELOPED 177 00:10:47,714 --> 00:10:50,448 THE SHADUF AROUND 4,000 YEARS AGO, 178 00:10:50,451 --> 00:10:53,851 PEOPLE HAVE BEEN CREATING NEW WAYS TO MOVE WATER. 179 00:10:53,854 --> 00:10:56,187 BEFORE PEOPLE RELIED ON ELECTRICITY, 180 00:10:56,190 --> 00:11:00,123 WINDMILLS GENERATED POWER USING WATER-WELL CYLINDERS. 181 00:11:00,126 --> 00:11:02,860 THESE SIMPLE BUT HIGHLY EFFECTIVE MECHANISMS 182 00:11:02,863 --> 00:11:04,695 ARE STILL IN USE TODAY. 183 00:11:07,001 --> 00:11:08,932 PRODUCTION OF THIS WATER-WELL CYLINDER 184 00:11:08,935 --> 00:11:11,535 BEGAN IN THE LATE 1800s. 185 00:11:11,538 --> 00:11:15,940 THE DESIGN WAS SO EFFECTIVE, IT HASN'T CHANGED SINCE. 186 00:11:16,943 --> 00:11:20,478 TO CREATE THE VALVES INTEGRAL TO WATER-WELL CYLINDERS, 187 00:11:20,481 --> 00:11:23,347 THE PROCESS STARTS WITH A SPECIALIZED MOLD 188 00:11:23,350 --> 00:11:26,083 MADE OUT OF COMPRESSED SAND. 189 00:11:26,086 --> 00:11:29,420 THESE ORANGE TUBE-SHAPED OBJECTS ARE CALLED CORES, 190 00:11:29,423 --> 00:11:32,089 ALSO MADE FROM COMPRESSED SAND. 191 00:11:32,092 --> 00:11:34,825 THE CORES ALLOW MOLTEN METAL TO FLOW AROUND THEM, 192 00:11:34,828 --> 00:11:38,763 ENSURING THAT THE VALVE CAGE REMAINS HOLLOW. 193 00:11:38,766 --> 00:11:41,365 WITH THE TOP OF THE MOLD CASING IN PLACE, 194 00:11:41,368 --> 00:11:45,403 THE ASSEMBLY MOVES TO THE NEXT STATION ON THE PRODUCTION LINE. 195 00:11:46,973 --> 00:11:51,375 A ROBOTIC ARM LOWERS THE JACKET AND WEIGHT ON TO EACH MOLD 196 00:11:51,378 --> 00:11:54,945 TO PREVENT THE MOLTEN METAL FROM ESCAPING. 197 00:11:54,948 --> 00:11:58,315 A METAL WORKER DROPS PIECES OF METAL, CALLED RETURNS, 198 00:11:58,318 --> 00:12:00,051 INTO A CRUCIBLE. 199 00:12:03,924 --> 00:12:05,789 WHEN THE TEMPERATURE OF THE MOLTEN METAL 200 00:12:05,792 --> 00:12:11,195 REACHES 2,102 DEGREES FAHRENHEIT, IT'S READY TO POUR. 201 00:12:11,198 --> 00:12:13,397 ANOTHER METAL WORKER USES A DEVICE 202 00:12:13,400 --> 00:12:17,267 CALLED A CRADLE TO HOIST AND MOVE THE CRUCIBLE. 203 00:12:17,270 --> 00:12:20,537 HE POURS THE LIQUEFIED METAL INTO A SPRUE HOLE, 204 00:12:20,540 --> 00:12:24,942 WHICH FLOWS INTO THE MOLD OPENINGS. 205 00:12:24,945 --> 00:12:29,480 THE MOLDS COOL AS THEY HEAD TO A VIBRATORY CONVEYOR SYSTEM. 206 00:12:29,483 --> 00:12:32,016 THE VIBRATIONS BREAK THE SAND APART, 207 00:12:32,019 --> 00:12:36,954 LEAVING IN ITS PLACE THE NEWLY FORMED METAL PARTS. 208 00:12:36,957 --> 00:12:39,757 A TECHNICIAN REMOVES THE PARTS WITH A HOOK 209 00:12:39,760 --> 00:12:42,693 AND MOUNTS THEM ON AN OVERHEAD TRANSPORT SYSTEM. 210 00:12:42,696 --> 00:12:47,365 THE TRANSPORT SYSTEM CARRIES THEM INTO A BLAST MACHINE. 211 00:12:47,368 --> 00:12:51,168 INSIDE, STEEL SHOT BLASTS THE METAL CLEAN. 212 00:12:53,973 --> 00:12:56,707 WHEN THE PARTS EMERGE FROM THE BLAST MACHINE, 213 00:12:56,710 --> 00:13:00,378 THE CASTINGS ARE READY FOR THE NEXT PHASE. 214 00:13:00,381 --> 00:13:03,580 USING A BAND SAW WITH A DIAMOND-TIPPED BLADE, 215 00:13:03,583 --> 00:13:06,050 A METAL WORKER CAREFULLY CUTS THE CASTINGS 216 00:13:06,053 --> 00:13:08,185 INTO THEIR COMPONENT PARTS. 217 00:13:11,859 --> 00:13:15,125 ROUGH CASTINGS HAVE A SEAM CALLED A PARTING LINE, 218 00:13:15,128 --> 00:13:17,528 WHERE THE TWO HALVES OF A MOLD MEET. 219 00:13:17,531 --> 00:13:21,165 A METAL WORKER GRINDS OFF THE EXCESS CASTING. 220 00:13:21,168 --> 00:13:25,402 THE ROUGH CASTING GOES THROUGH A MACHINING PROCESS. 221 00:13:25,405 --> 00:13:27,204 AS THE VALVES ARE ASSEMBLED, 222 00:13:27,207 --> 00:13:30,407 A SMALL PIECE OF NEWSPAPER IS PLACED INSIDE 223 00:13:30,410 --> 00:13:34,011 TO PREVENT ANY DAMAGE TO THE BALLS DURING SHIPMENT. 224 00:13:34,014 --> 00:13:38,015 THESE BRASS, PRECISION-GROUND BALLS ARE CRUCIAL COMPONENTS 225 00:13:38,018 --> 00:13:40,418 THAT PERMIT OR PREVENT WATER FLOW 226 00:13:40,421 --> 00:13:45,022 AS THEY MOVE UP AND DOWN INSIDE THE VALVE CAGE. 227 00:13:45,025 --> 00:13:48,024 THESE COMPONENTS ARE MADE OF LEATHER THAT'S BEEN PRESSED, 228 00:13:48,027 --> 00:13:51,562 FORMED, AND COATED WITH GRAPHITE TO LUBRICATE THEM. 229 00:13:52,966 --> 00:13:54,297 WATER-WELL CYLINDERS 230 00:13:54,300 --> 00:13:57,501 HAVE BOTH A CHECK VALVE AND A PLUNGER VALVE. 231 00:13:57,504 --> 00:14:01,305 A TECHNICIAN TIGHTENS A FOLLOWER ON A PLUNGER VALVE. 232 00:14:01,308 --> 00:14:03,374 WHILE A CHECK VALVE REMAINS STATIONARY 233 00:14:03,377 --> 00:14:05,709 AND PREVENTS WATER FROM ESCAPING, 234 00:14:05,712 --> 00:14:07,778 A PLUNGER VALVE ISN'T FIXED, 235 00:14:07,781 --> 00:14:11,916 SO IT ALLOWS WATER TO MOVE OUT THE TOP. 236 00:14:11,919 --> 00:14:15,653 A WATER-WELL CYLINDER REQUIRES CAPS AND CONNECTORS. 237 00:14:15,656 --> 00:14:20,725 A CNC LATHE MACHINES A BRASS CAP TO THE REQUIRED PARAMETERS. 238 00:14:20,728 --> 00:14:23,861 AS THE COMPONENT SPINS AT 800 RPM, 239 00:14:23,864 --> 00:14:26,931 CARBIDE-TIPPED CUTTING TOOLS HONE, BORE, 240 00:14:26,934 --> 00:14:29,666 AND THREAD IT WHERE NEEDED. 241 00:14:29,669 --> 00:14:32,470 THE CYLINDERS ARE MADE FROM BRASS TUBING. 242 00:14:32,473 --> 00:14:35,005 THE 3-MILLIMETER-THICK SEAMLESS TUBING 243 00:14:35,008 --> 00:14:38,409 IS MADE FROM A BRASS BILLET HEATED UNTIL SOFT ENOUGH 244 00:14:38,412 --> 00:14:42,880 TO DRAW THROUGH AN INNER AND OUTER DIE. 245 00:14:42,883 --> 00:14:46,483 THE RESULT IS A STRONG, CORROSION-RESISTANT CYLINDER 246 00:14:46,486 --> 00:14:51,255 THAT CAN HANDLE WATER PRESSURE AND IMMERSION FOR DECADES. 247 00:14:51,258 --> 00:14:54,425 A CNC DEVICE THREADS BOTH ENDS OF THE CYLINDER 248 00:14:54,428 --> 00:14:57,761 TO RECEIVE THE CAP AND CONNECTOR. 249 00:14:57,764 --> 00:15:00,630 A TECHNICIAN BRUSHES A PIPE-COMPOUND SEALANT 250 00:15:00,633 --> 00:15:02,099 ON TO THE THREADS. 251 00:15:02,102 --> 00:15:05,169 THE SEALANT ENSURES A WATERTIGHT FIT. 252 00:15:05,172 --> 00:15:10,040 THEN HE SCREWS THE CAP TO THE BOTTOM END OF THE CYLINDER. 253 00:15:10,043 --> 00:15:15,446 HE ADDS THE TOP CONNECTOR AND INSERTS BOTH ENDS INTO A LATHE. 254 00:15:15,449 --> 00:15:19,049 WITH THE BOTTOM HELD FIRMLY IN PLACE BY THE LATHE CHUCK, 255 00:15:19,052 --> 00:15:21,318 HE PLACES A WRENCH ON THE TOP END 256 00:15:21,321 --> 00:15:23,721 AND LETS THE MACHINE TIGHTEN THE PARTS. 257 00:15:26,927 --> 00:15:29,326 NEXT, THE CHECK VALVE AND THE PLUNGER VALVE 258 00:15:29,329 --> 00:15:32,997 ARE INSERTED INTO THE CYLINDER. 259 00:15:33,000 --> 00:15:35,132 THIS CLEAR ACRYLIC VERSION OF THE CYLINDER 260 00:15:35,135 --> 00:15:38,335 DEMONSTRATES HOW THE PROCESS WORKS. 261 00:15:38,338 --> 00:15:40,805 AS THE PLUNGER VALVE SLIDES UP AND DOWN, 262 00:15:40,808 --> 00:15:45,008 THE CHECK VALVE REMAINS STATIONARY. 263 00:15:45,011 --> 00:15:49,847 IT'S HARD NOT TO BE PUMPED ABOUT AN OLD TECHNOLOGY SO GOOD. 264 00:15:58,291 --> 00:16:03,427 ♪ 265 00:16:03,430 --> 00:16:06,029 Narrator: NONCONDUCTIVE DIGGING AND CUTTING TOOLS 266 00:16:06,032 --> 00:16:08,965 PROTECT WORKERS FROM POTENTIAL HAZARDS SUCH AS 267 00:16:08,968 --> 00:16:10,967 UNDERGROUND POWER LINES. 268 00:16:10,970 --> 00:16:13,837 WHEN A NONCONDUCTIVE TOOL HITS A LIVE WIRE, 269 00:16:13,840 --> 00:16:15,839 THE RISK IS NEUTRALIZED. 270 00:16:15,842 --> 00:16:18,375 THE HANDLE BLOCKS THE FLOW OF ELECTRONS 271 00:16:18,378 --> 00:16:22,646 AND REDUCES THE RISK OF UNEXPECTED SHOCKS. 272 00:16:22,649 --> 00:16:24,981 WORKERS WHO NEED TO DIG RUN THE RISK 273 00:16:24,984 --> 00:16:27,451 OF HITTING LIVE ELECTRICAL WIRES. 274 00:16:27,454 --> 00:16:29,987 THE NONCONDUCTIVE HANDLES OF THESE TOOLS 275 00:16:29,990 --> 00:16:32,055 WILL COUNTERACT THE FLOW OF ELECTRICITY, 276 00:16:32,058 --> 00:16:35,258 STOPPING DANGER IN ITS PATH. 277 00:16:35,261 --> 00:16:37,728 THE HANDLES ARE MADE OF FIBERGLASS. 278 00:16:37,731 --> 00:16:41,264 THEY ARE MADE USING A PROCESS KNOWN AS PULTRUSION. 279 00:16:41,267 --> 00:16:43,067 A MACHINE PULLS GLASS TWINE 280 00:16:43,070 --> 00:16:45,402 THROUGH THE STAGES OF PRODUCTION. 281 00:16:45,405 --> 00:16:49,673 EACH PIECE OF TWINE IS COMPRISED OF HUNDREDS OF GLASS STRANDS. 282 00:16:51,078 --> 00:16:54,477 THE TWINE UNWINDS THROUGH AN ORANGE RESIN BATH, 283 00:16:54,480 --> 00:16:57,748 WHICH PERMEATES THE GLASS FIBERS. 284 00:16:57,751 --> 00:17:00,350 A DIE COMPRESSES THE RESIN-SOAKED GLASS 285 00:17:00,353 --> 00:17:02,886 TO A SPECIFIC LENGTH AND WIDTH. 286 00:17:02,889 --> 00:17:07,424 THE RESULT IS SLIGHTLY LARGER THAN WHAT IS ULTIMATELY NEEDED. 287 00:17:07,427 --> 00:17:09,626 THE COMPRESSED FIBERGLASS TRAVELS THROUGH 288 00:17:09,629 --> 00:17:13,230 A MICROWAVE OVEN FOR PREHEATING. 289 00:17:13,233 --> 00:17:16,633 THEN THE FIBERGLASS ENTERS A SECOND HEATED DIE. 290 00:17:16,636 --> 00:17:21,105 THE PROCESS SQUEEZES THE HANDLE TO ITS FINAL SIZE, SHAPES IT, 291 00:17:21,108 --> 00:17:23,107 AND CURES THE MATERIAL. 292 00:17:23,110 --> 00:17:24,641 AS IT'S PULLED FORWARD, 293 00:17:24,644 --> 00:17:28,779 THE LONG FIBERGLASS FORM COOLS AND SOLIDIFIES. 294 00:17:28,782 --> 00:17:32,449 THIS MACHINE, CALLED THE TRACTOR, IS DOING THE PULLING. 295 00:17:32,452 --> 00:17:36,519 THE TRACTOR'S TREADED RUBBER PADS GRAB THE FIBERGLASS SHAFT 296 00:17:36,522 --> 00:17:39,122 AND DELIVER IT TO A CIRCULAR SAW. 297 00:17:39,125 --> 00:17:43,661 THE SAW SLICES THE FIBERGLASS SHAFT TO A SPECIFIED LENGTH. 298 00:17:43,664 --> 00:17:46,663 SINCE THE FIBERGLASS IS ONLY PARTIALLY CURED, 299 00:17:46,666 --> 00:17:51,201 THE HANDLES ARE COOLED AT ROOM TEMPERATURE FOR 24 HOURS. 300 00:17:51,204 --> 00:17:54,804 THE HANDLES VARY BASED ON THE TYPE OF TOOL. 301 00:17:54,807 --> 00:17:58,075 A MACHINIST CUTS ONE END OF THE HANDLE ON AN ANGLE 302 00:17:58,078 --> 00:17:59,910 TO FIT THE BLADE SHANK. 303 00:18:03,750 --> 00:18:05,482 USING A SHARP DISC, 304 00:18:05,485 --> 00:18:09,353 HE CARVES SPIRAL GROOVES AT THE BASE OF THE ANGLE CUT. 305 00:18:09,356 --> 00:18:12,022 THESE GROOVES ALLOW THE SHOVEL SHANK TO FUSE 306 00:18:12,025 --> 00:18:13,757 WITH THE END OF THE HANDLE. 307 00:18:16,829 --> 00:18:20,697 NEXT, THE HANDLE IS PLACED IN AN INJECTION-MOLDING MACHINE 308 00:18:20,700 --> 00:18:24,168 WITH THE GROOVED END EXTENDED INTO THE MOLD. 309 00:18:24,171 --> 00:18:27,104 GLASS-FILLED NYLON PELLETS MOVE THROUGH THE MACHINE'S 310 00:18:27,107 --> 00:18:30,374 HEATED CHAMBER AND MELT. 311 00:18:30,377 --> 00:18:33,910 AN AUGER FORCES THE THICK LIQUID INTO THE MOLD. 312 00:18:33,913 --> 00:18:37,380 THE SHOVEL SHANK TAKES SHAPE AROUND THE END OF THE HANDLE, 313 00:18:37,383 --> 00:18:41,585 AND GLASS-FILLED NYLON LIQUID FLOWS INTO THE GROOVES. 314 00:18:41,588 --> 00:18:44,355 THE SHANK BECOMES INTEGRAL TO THE HANDLE. 315 00:18:46,860 --> 00:18:50,127 NEXT, A MACHINIST CLIPS THE EXCESS MATERIAL 316 00:18:50,130 --> 00:18:52,262 FROM THE NEWLY FORMED SHANK. 317 00:18:52,265 --> 00:18:55,799 THE GLASS AND NYLON SHANK IS ALSO NONCONDUCTIVE. 318 00:18:55,802 --> 00:19:00,738 THE SHANK END IS SUBMERGED IN A COOLING BATH. 319 00:19:00,741 --> 00:19:04,607 USING A DRILL, THE MACHINIST REMOVES BOLTS FROM NUTS 320 00:19:04,610 --> 00:19:07,444 INSTALLED IN THE SHANK DURING MOLDING. 321 00:19:07,447 --> 00:19:10,346 THIS LEAVES THE NUTS EMBEDDED IN THE SHANK. 322 00:19:10,349 --> 00:19:13,117 THEY'LL BE USED TO ATTACH THE SHOVEL BLADE. 323 00:19:16,756 --> 00:19:20,023 MEANWHILE, ANOTHER TECHNICIAN APPLIES A RUBBER GASKET 324 00:19:20,026 --> 00:19:21,892 TO THE END OF THE SHANK. 325 00:19:21,895 --> 00:19:25,362 THE GASKET HAS HOLES THAT KEEP THE NUTS OPEN. 326 00:19:25,365 --> 00:19:28,098 HE PLACES THE SHOVEL BLADE ON THE ASSEMBLY, 327 00:19:28,101 --> 00:19:30,567 ALIGNING THE HOLES WITH THE NUTS. 328 00:19:30,570 --> 00:19:34,204 HE SECURES THE SHOVEL BLADE TO THE SHANK WITH SCREWS. 329 00:19:37,644 --> 00:19:41,111 IT'S NONCONDUCTIVE FROM THE HANDLE TO THE METAL BLADE, 330 00:19:41,114 --> 00:19:45,482 SO THE USER CAN SAFELY GRIP IT AT ALMOST ANY SPOT. 331 00:19:46,319 --> 00:19:48,452 APART FROM BEING NONCONDUCTIVE, 332 00:19:48,455 --> 00:19:51,155 THIS SHOVEL MUST ALSO BE HEAVY-DUTY. 333 00:19:53,726 --> 00:19:55,258 TO TEST ITS STRENGTH, 334 00:19:55,261 --> 00:19:58,262 AN INSPECTOR INSERTS THE BLADE INTO A MACHINE. 335 00:20:01,401 --> 00:20:03,667 ONCE HE HAS DETERMINED THE TEST AREA, 336 00:20:03,670 --> 00:20:06,136 THE CHAIN IS CONNECTED TO A CONTAINER FILLED 337 00:20:06,139 --> 00:20:09,406 WITH SAND BAGS THAT WEIGH 250 POUNDS. 338 00:20:11,878 --> 00:20:14,478 HE LOWERS THE PLATFORM THAT HOLDS THE LOAD 339 00:20:14,481 --> 00:20:16,613 AND OBSERVES THE HANDLE. 340 00:20:16,616 --> 00:20:22,219 IF THE HANDLE BENDS BUT DOESN'T BREAK, IT'S SUFFICIENTLY STRONG. 341 00:20:22,222 --> 00:20:25,488 THE INSPECTOR PLACES THE SHOVEL IN ANOTHER TESTER 342 00:20:25,491 --> 00:20:28,825 AND RUNS 10,000 VOLTS OF ELECTRICITY THROUGH THE TOOL 343 00:20:28,828 --> 00:20:33,097 TO MEASURE THE LEAKAGE AT THE END OF THE HANDLE. 344 00:20:33,100 --> 00:20:37,300 IF IT'S MINIMAL, HE ASSIGNS THE SHOVEL A UNIQUE SERIAL NUMBER 345 00:20:37,303 --> 00:20:38,968 AND BRANDS IT AS CERTIFIED 346 00:20:38,971 --> 00:20:41,138 ACCORDING TO ELECTRICAL STANDARDS. 347 00:20:44,177 --> 00:20:48,445 ON SITE, A NONCONDUCTIVE TOOL CAN BE INDISPENSABLE, 348 00:20:48,448 --> 00:20:50,980 PROVIDING THE USER A SAFE HANDLE 349 00:20:50,983 --> 00:20:54,184 ON A POTENTIALLY DANGEROUS SITUATION.